Summary of Construction Projects
Director of Maintenance and Operations - Carlos
Aluizo

2002 Bond Allocation
The sale of $128,500,000 in bonds was put before voters in September, 2002.
Over 80% of voters approved the bond issue. A break-down of how the money will
be allocated to improve facilities, enhance technology, and purchase capital
outlay equipment is outlined below.
Stephen F. Austin Elementary
Remove and replace existing carpet and vinyl flooring
Complete renovation of public restrooms; new flooring in classroom restrooms
Replace 2 hollow metal doors, side lights; recaulk windows
Install door and frame at entrance to library cave
Replace cabinet doors
Add 4 electrical outlets in classrooms; repair/replace faulty wiring and
circuitry in building
Replace galvanized domestic water piping
Total..............................................................................
$511,000
A.P. Beutel Elementary
School
Renovate the Tally Building
Renovate select boys and girls public restrooms, all teacher restrooms
Upgrade existing air conditioning system
Install ADA Accessible drinking fountains
Replace walkway covers; add additional covered walkway; install new lighting
Replace existing roof systems
Replace damaged carpet
Install new storm drainage; repair or replace gutters and downspouts
Install new entrance foyer
Add 4 electrical outlets to each classroom
Repair or replace walk-in cooler
Replace galvanized domestic water piping
Total.............................................................................. $1,795,000
Bess Brannen Elementary
Replace 22 fan coil units; replace library A/C system
Remove and replace existing carpet and vinyl flooring
Install new acoustical lay-in ceiling and lighting
Replace all canopy walkway covers (front)
Renovate classroom into new teacher workroom
Repaint select interior and exterior surfaces
Construct new teacher restroom
Convert storage room into a head-end room (where existing technology wiring is
installed)
Replace sealant at windows
Replace all galvanized domestic water piping
Total..............................................................................
$931,000
O.A. Fleming Elementary
Replace damaged acoustical lay-in ceiling panels
Install new walkway canopies at cafeteria entrance
Replace damaged air conditioning vents in cafeteria
Replace exterior doors and hardware in the cafeteria
Repair or replace roof on gym and cafeteria
Install new vinyl tile floor in cafeteria
Renovate boys and girls restrooms in cafeteria
Install acoustical lay-in ceiling and lighting in cafeteria
Total..............................................................................
$295,500
Madge Griffith Elementary
Construct concrete
parking lot for 20 automobiles
Total................................................................................. $40,000
Jane Long Elementary
Replace galvanized domestic water piping
Replace all carpet in existing building
Replace the existing air conditioning system
Install new vinyl tile floors
Recaulk exterior windows; replace weather stripping at exterior doors
Install 4 electrical outlets in all classrooms
Refinish stage floor; install new lighting and ceiling system at stage
Construct concrete parking lot for 44 automobiles
Install ventilation systems in boys and girls restrooms
Add fill dirt around building and playground
Install new Universal clock system
Replace 350 l.f. of sanitary sewer at office/main wing
Demolish "B" wing
Build 14 new classrooms and restroom addition
Total...........................................................................
$2,311,000
Elisabet Ney Elementary
Repaint cracks in exterior and interior brick walls
Install covered walkway to bus drop-off area
Replace toilet fixtures in first and second grade wing; renovate other student
restrooms
Replace portion of walkway covers; install lighting
Improve site drainage around perimeter of building
Replace damaged sidewalks around buildings
Replace all carpet
Convert existing stage into general storage
Convert existing cafeteria into a P.E. room
Provide exhaust ventilation in restrooms
Install new covered walkway at front entrance
Replace all galvanized domestic water piping
Build new cafeteria/kitchen, 5 classrooms and restroom addition
Total...........................................................................
$2,731,000
T.W. Ogg Elementary
Replace acoustical ceiling and
lighting in library wing
Construct concrete parking lot for 25 automobiles
Power-clean exterior of existing building
Repaint select exterior surfaces
Install new entrance foyer
Replace galvanized domestic water piping
Replace walk-in cooler/freezers
Install new carpet at front entrance foyer
Install new ceiling and lighting at entrance to "Munchkinland"
Install new carpet in classrooms in "Kansas wing"
Make improvements to electrical wiring and circuitry at "Enchanted Forest and
Poppy Field" buildings
Construct corrugated canopy cover at student drop-off
Install ADA acceptable drinking fountains
Total..............................................................................
$839,300
Gladys Polk Elementary
Complete renovation of front
office/teacher work area
Replace all existing carpet
Install weather-stripping and sealant at each "porthole window"
Install a 3'-0" x 7'-0" door and frame at entrance to library cave
Construct teacher workroom and one pair of teacher restrooms
Add fill dirt around the building to improve drainage
Install new concrete bike rack area
Improve gravel bike paths
Total..............................................................................
$402,000
O.M. Roberts Elementary
Investigate concrete slab and make
necessary repairs
Replace all existing carpet and vinyl tile floors
Replace blinds in classrooms with mini-blinds
Provide cover plates at gaps in walls
Renovate two pair of restrooms
Replace existing exterior doors
Improve drainage around building and playground
Install acoustical ceiling panels throughout building
Add concrete parking lot for 25 automobiles
Replace kitchen serving line and select storage shelving
Build 4 new classrooms and restroom addition
Total...........................................................................
$1,150,500
Velasco Elementary
Construct a new
campus to house 650 students
Total........................................................................... $7,665,000
R. O’Hara Lanier Middle
School
Install public address system for
Brazosview and Sixth Grade wing
Install fire alarm system for Brazosview and Sixth Grade wing
Build 6 new classrooms, library, cafeteria/kitchen
Renovate Brazosview into 14 classrooms, relocate Fine Arts and convert old
library into classrooms
Build 100 parking spaces
Total...........................................................................
$4,810,000
New Clute Middle School/Intermediate School
Construct new campus to house 500
5th-6th grade students
Construct new campus to house 600 7th-8th grade students
Total.........................................................................
$17,547,500
Rasco Middle
School
Repair and replace blockage in
sanitary sewer line beneath parking lot
Convert bookroom into changing room with toilet for Special Education; convert
Room 512 to bookroom
Replace deteriorated sheet vinyl flooring in restrooms with ceramic tile
Build 2 new classrooms, new gymnasium, fine arts wing and renovation of existing
music room into 4 classrooms
Total...........................................................................
$1,896,000
Freeport Intermediate
Construct concrete parking lot for
25 automobiles
Construct concrete sidewalk from school to tennis court
Construct 10 concrete visitor parking spaces at front of building
Construct concrete driveway to rear of building
Repaint exterior doors and frames
Rework shower floor in boys dressing room
Reroute condensate line to floor drain next to serving line
Total..............................................................................
$131,100
Lake
Jackson Intermediate
Construct a new
campus to house 1100 7th & 8th grade students
Total......................................................................... $16,573,000
Brazoswood High
School
Upgrade
HVAC system
Construct 4 new science labs
Renovate existing science labs
Construct new concrete parking lot for 75 automobiles
Make modifications to administrative offices
Construct 2 teacher workrooms
Make improvements to cafeteria dining/serving areas
Construct 8 additional classrooms
Upgrade exhaust system at swimming pool
New ceramic wall tile in corridors
Replace existing elevator
Install new acoustical lay-in ceiling and lighting system
Install additional electrical outlets in classrooms
Replace drinking fountains
Repair/replace existing master clock and bell system
Replace all galvanized domestic water piping with copper
Air condition old gym dressing area
Renovate dressing facilities and field house at Wilson Field
Total...........................................................................
$9,370,000
Brazosport High
School
Construct new classrooms and
administration area
Construct new cafeteria and kitchen
Install new kitchen equipment and serving lines
Construct main competition gym; renovate 2 practice gyms
New athletic/P.E. dressing area
New roof and renovation to existing athletic area; convert P.E. area to storage
facility
Renovate Ag, Music, Vocational buildings; renovate auditorium, lobby
Construct new library and support facilities
Site improvements
Total.........................................................................
$21,739,184
Alternative Education Placement Center
Renovate existing
facility
Total.............................................................................. $750,000
District-Wide Projects
District-wide asbestos abatement
District-wide ADA (American Disabilities Act) improvements
Total...........................................................................
$1,250,000
Transportation Department
Purchase 5 school
buses over the next 4 years
Total........................................................................... $1,200,000
Career and Technology Education
Purchase capital
equipment for vocational programs
Total........................................................................... $1,000,000
District-Wide Technology
Upgrade network infrastructure
Upgrade telecommunications
Purchase desktop computers
Upgrade software
Install fiber systems for new schools
Total...........................................................................
$8,605,000
Athletic Facility Improvements
Replace
field house and press box at Hopper Field
Relocate Lions baseball field/stadium to Freeport Intermediate School
Relocate old football field/stadium to Freeport Intermediate School and add 200
parking spaces
Renovate Wilson Field stadium
Repair track at Slade Field
Total...........................................................................
$4,500,000
District-Wide Band Equipment
Replace aged band
equipment
Total.............................................................................. $750,000
District-Wide Construction
Inflation and Contingency
Total........................................................................... $8,800,201
District-Wide Furniture, Fixtures, Professional Fees, Soil
Reports and Material Testing
Total......................................................................... $10,906,715