In May 2019, voters passed a $267 million bond program which included the replacement of the 50-year old Brazoswood High School Main Campus, Fine Arts, CTE and Field House. The District has engaged VLK Architects and the design development for a new multi-sport field house has been completed.
The new Brazoswood High School Multi-Sport facility is phase one of a four-phase, $150 million project. This facility will open Summer 2020 at which time the old field house will be demolished, making room on the existing site to begin construction of the new Brazoswood High School main campus.
The new two-story facility will be located on the east side of Slade Field offering direct student access during and after school hours. Students and visitors will access the facility from an expanded parking lot off of Brazoswood Drive. The facility will serve over 1,000 high school students participating in athletics and locker rooms for football, softball, soccer, track, cross country, wrestling, and powerlifting. State of the art amenities includes a 9,000 square foot strength and conditioning weight room, prevention and rehabilitation athletic training and rehabilitation room, wrestling practice mat room, and a multi-use meeting room with direct access to a second-floor covered observation deck overlooking Slade Field.
Male and female athletes have separate exterior entrances to their dressing areas, coupled with integrated coaches’ offices and dedicated access ways to common areas, creating a safe and secure environment for students within the building. The main entrance of the field house features an administrative suite and a trophy and achievement room connected to a secure lobby. The top floor will house a large meeting room, have an outdoor observation deck and an indoor balcony that will overlook the main corridor.